Apparatus heating gas household aogv 17.4 3. Heating systems for country and country houses

Specifications

Shipping and payment

Installation and service

Reviews 0

Spare parts

Specifications

The floor gas non-volatile single-circuit boiler ZHMZ AOGV-17.4-3 Universal H with an open combustion chamber is designed for heating residential, domestic, industrial and other premises up to 140 sq.m. On the front side This model has a removable chute that covers the automation unit and the gas burner. The advantage of the ZhMZ AOGV-17.4-3 Universal H boiler is the ability to work in systems with natural and forced air circulation, the boiler is compatible with any material from which the heating system is made (steel, cast iron, polypropylene, metal-plastic), as well as its operation does not depend on electricity and can be configured to operate on natural or liquefied gas.

Peculiarities

  • Complete with imported automation unit
  • Has a compact design
  • Adjusting the gas flow on the pilot burner
  • The built-in gas pressure stabilizer ensures a stable rated power of the boiler, regardless of fluctuations in gas pressure in the network gas pipeline
  • Smooth switching on and off of the main burner
  • Classic cylindrical shape
  • Stable operation at low gas pressure
  • The flow type heat exchanger is made of high-quality metal produced by NLMK
  • Heat exchanger steel thickness in the burner area - 2.5 mm
  • Screw turbulators are made of steel 2 mm thick and increase the efficiency of the boiler
  • Equipped with gas valve EuroSit (Italy)
  • Equipped with pointer thermometer and built-in piezo ignition
  • For the convenience of the consumer, the control is located in the upper part of the boiler.
  • Heating system coolant - softened water or household antifreeze
  • Service life of at least 14 years

Specifications

Boiler type Gas

Mounting method Floor

Combustion chamber type open

Thermal power, kW 17.4

Natural gas Yes

LPG Yes

Chimney diameter, mm 135

Steel

non-volatile Yes

Manufacturer Russia

Boiler type Gas

Working principle Convection

Number of circuits Single circuit

Mounting method Floor

Combustion chamber type open

Thermal power, kW 17.4

Natural gas Yes

LPG Yes

Chimney diameter, mm 135

Primary heat exchanger material Steel

non-volatile Yes

Manufacturer Russia

Power consumption, kW 17,4

Burner type Injection

Tank capacity, l 64

Ignition time, no more, sec 60

Overall dimensions (HxWxD), mm 1045-1055x415-425x475-485

Water pressure in the heating system, no more than, kPa 100

Diameter of heating pipes, inch G2

Gas supply fitting diameter, inch G 3/4

Range of maintaining the temperature of the heat carrier in the heat exchanger, ° С 50-90

Leak allowed, no more than, cc/h 70

Carbon monoxide index, no more than, vol.% 0.05

Number of screw turbulators, pcs 8

Efficiency in heating mode, not less than, % 88

Boiler weight (without packaging), no more than, kg 49

Minimum/Maximum Pressure natural gas, Pa (mm water column) 635 (65)/1764 (180)

Minimum / maximum pressure of liquefied gas, Pa (mm water column) 1960 (200)/3528 (360)

Minimum / maximum vacuum in the chimney, Pa (mm water column) 2,94 (0,3)/29,4 (3,0)

Outer diameter of the connecting branch pipe of the gas exhaust device, mm 133-137

Nominal pressure of natural gas, Pa (mm.water column) 1274 (130)

Nominal pressure of liquefied gas, Pa (mm water column) 2940 (300)

Heating of premises with heat loss no more than, kW 14.5

Heated room area H=2.7 m high, no more than, sq.m 100-140

Distance from the floor to the end of the outlet pipe of the heat exchanger, mm 1045-1055

Distance from the floor to the axis of the inlet pipe of the gas pipeline, mm 711-721

Distance from the floor to the axis of the inlet pipe of the heat exchanger, mm 287-297

Consumption of natural gas, no more than, m3/h 1.87

Consumption of liquefied gas, no more than, cubic m / h (kg / h) 0,65 (1,3)

Ignition type Piezo ignition

High reliability

The safety of the ZhMZ AOGV-17.4-3 Universal N boiler operation is ensured by automatic equipment, which is triggered when the flame on the igniter goes out, there is no draft in the chimney, the gas supply is interrupted or the gas pressure drops below the permissible value, the temperature of the coolant in the boiler tank rises above 93 - 100 °C. The pressure in the closed heating system in which the boiler can be used must not exceed 2.0 kgf/cm2. Boiler ZhMZ AOGV-17.4-3 Station wagon N has the ability to connect a boiler (purchased separately) to ensure hot water.

floor gas non-volatile single-circuit boiler with an open combustion chamber

About delivery

    • Delivery is carried out on working days from 12:00 to 18:00 Moscow time
    • Delivery outside the Moscow Ring Road is 50 rubles / km and is paid according to the actual distance traveled by the car. We recommend using the Yandex.Maps service to find out the exact distance.
    • Delivery at a distance of more than 130 km from Moscow is carried out through transport and logistics companies
    • Delivery on weekends, holidays, urgent delivery the same day, delivery of the order at exactly the specified time is carried out at increased rates and after agreement with the store
    • Upon delivery of the order by truck, the unloading of the goods is carried out by the Buyer
    • Approximately 1 hour before delivery, the forwarder contacts the Buyer. If it is impossible to confirm the acceptance and transfer of the order to the appointed address, the delivery is canceled
    • Pickup is carried out after the store confirms the movement of goods to the point of issue of the order
    • The Forwarder does not advise on technical parameters and functional features goods, their compatibility, cost, etc. This information can be obtained by calling our office at the contact numbers
    • Our trucks deliver orders along pre-planned routes on a schedule that provides for high accuracy. Therefore, we ask you to be understanding that unloading, checking and payment for goods must be made within 10-15 minutes.

About payment

    • We accept payment for the goods only in rubles for cash or bank transfer
    • The price of the goods includes the VAT rate of 20%
    • Sending an order to the regions of the Russian Federation through transport companies is made to the Buyer only after 100% prepayment
    • The exact cost of payment is calculated from the cost of goods and the cost of delivery (outside the Moscow Ring Road, for urgency, for the exact delivery time) of the order. Please take this into account

Installation

The specialists of our company carry out a paid visit to the site, while the cost of the visit is returned upon conclusion of the contract, on the spot they will agree with you on the terms, stages and scope of work, select equipment and components.

After the conclusion of the Contract and the prepayment, the delivery, installation and commissioning of the equipment is carried out at the appointed time. Upon completion of the work, Acts are drawn up and full payment is made.

The prices for the departure of a specialist and installation of equipment can be found at the link.

Service and repair

At your request, the company is ready to conclude a contract with you for an annual service maintenance. The advantage is an extended warranty for the work performed and preferential maintenance of equipment.

If such an Agreement has not been concluded, then you can contact the specialized service centers using the link.


Company manufacturer:

Description Gas boiler AOGV-17.4-3 Economy:

The boiler is placed on the site as a customer support for the correct selection of spare parts.
Purpose: For heating
Fuel type: Natural (main) gas or liquefied (balloon) gas

Boiler independent of electricity
Boiler automation: Gas valve ZhMZ
Power, kW: 17.4
Dimensions: 1055 mm x W 425 mm x D 485 mm
Maximum operating pressure: 1.5 atm.(Use an open expansion tank)
Boiler tank volume: 64 l
Chimney diameter: 135 mm
Connection fitting diameters:
- gas - 3/4""
- inlet / outlet of the heating part - 2 ""
Gas consumption, no more than - 1.87 m3 per hour
Liquefied no more - 1.3 kg per hour
Weight: 49 kg
Consumable parts for this model:
- thermocouple for boilers AOGV-17.4 and AKGV-17.4 Economy, manufactured before 1.07.1996 - article number
- thermocouple for boilers AOGV-17.4 and AKGV-17.4 Economy manufactured from 06/01/1996 to 02/2002 - article number
- thermocouple for boilers AOGV-17.4 and AKGV-17.4 Economy of release 02.2002 to 01.02.2003 - article
- thermocouple for boilers AOGV-17.4 and AKGV-17.4 Economy manufactured from 05.2004 - article - the same for all models
- assembly automation unit for boilers AOGV and AKGV-17.4 Economy of release until 07/01/1999 - article number
- complete automation unit for boilers AOGV and AKGV-17.4 Economy, manufactured before 07/01/2000 - article number
- assembly automation unit for boilers AOGV and AKGV-17.4 Economy of release from 07/01/1999 to 02/2002 - article number
- assembly automation unit for AOGV and AKGV-17.4 Economy boilers, manufactured from 02.2002 - article - bulb-bellows assembly for AOGV and AKGV-17.4 Economy boilers, manufactured before 01.01.1992 - article - bulb-bellows assembly for boilers AOGV and AKGV-17.4 Economy release from 01.01.1992 to 02.2002 - article
To repair the block, see
Please read in the heating system
It is strongly recommended to install in systems with an open expansion tank
For normal use recommended antifreeze for open systems
Before installation, please read
Basic knowledge
Answers to frequently asked questions when buying

Distinctive features Gas boiler AOGV-17.4-3 Economy:

Working and practicing repair, we give you eight points that other boiler manufacturers simply will not give an answer to, because the time is not right, and the money is not the same, and the conditions are not the same, and people, too, have already "wasted", so that for their own responsibility solve these kinds of questions.

Agree that for the boilers of the Zhukovsky plant this is a real advantage:

1. Availability. The boiler is produced by us. 100%.
2. Availability of spare parts. Here we already answer directly. Parts are and will be. 100%
3. There are NO requirements for the heating system. You don't need to download or set up. If necessary, then open-type expansion tank installed under the ceiling. I poured water with a ladle and it works. 100%
4. There are no requirements for the qualification of the master. No. Any person will start the boiler. Anyone can fix it. one hundred%
5. Does not require mandatory electricity, stabilizers and pumps. Works by itself. Boiler automation does not require electricity. Very relevant. 100%
6. There is no maintenance of either the system or the boiler itself. There is no service where you need to run a little, otherwise there will be no guarantee. Once you did everything right and calm down - enough for 15-20 years. 100 %
7.Practical experience of the plant itself, and gas facilities, and ordinary people: fathers, mothers, grandmothers and grandfathers with such boilers are very large, from the 50s. Therefore, the Zhukovsky cauldron itself, and our experience of working with it, is a national treasure and a heritage of the time. And this should not be forgotten. one hundred%
8. Alteration of the boiler, if desired, for liquefied gas is so simple, even primitive and consists only in twisting the nozzles for liquefied gas into the burner and nothing more. one hundred%

Taking into account all the above points, we advise you to always work with us for the simple reason that our attitude to this work is exactly what you need. Thanks!

Our comment:

Introducing a boiler with a gas valve ZHMZ.

The boiler delivery set includes: The device itself, a draft interrupter, a thermometer, a gasket, a shield, a product passport, valve gaskets (a spare part for a gas block). The draft sensor itself is located on the upper part of the boiler in a special recess in the housing (it is not at all difficult to notice).

A sticker with its number and type is pasted on the inside of the door of each device, the number indicated on this sticker must match the number indicated in the product passport when it was sold. The top of the boiler is covered with a lid, in which small holes are visible - these are turbulators. Due to them, the maximum efficiency for this boiler design is achieved.

The pipe that exits vertically from the boiler is the heating "supply" pipe. Behind the boiler is a "return" pipe. Both pipes are 2"". Automation is a block with a union nut with a diameter of 3/4 "" for connecting gas and a boiler control unit.

In our case, the bellows-thermoballoon is responsible for adjusting and maintaining the temperature we need in the AOGV Zhukovsky gas boiler with the Economy automation unit. In fact, the bellows mechanically opens gas access to the main burner of the boiler, and when the designated temperature is reached in the boiler, closes this access.

Knowledge base on jets Technic San. 2020.

Everything we know about jets. Year 2020. Open information. Jets. Nozzles. Nozzles. Everything we know today. Publication start date 10.10.2017
Attention! At the end of the article is a constantly updated Knowledge Base on Jets with which we can live and work today. All links are working. Use the links provided in the database. This will make selection much faster. required material and its study. Thanks!

PURPOSE

The device is intended for heat supply of residential premises and buildings for communal use, equipped with water heating systems with a water column height in the water circuit of not more than 6.5 m.
The device is designed for continuous operation on natural gas in accordance with GOST 5542-87.
The device is manufactured in UHL climatic version, category 4.2 according to GOST 15150-69.

Specifications Safety Devices
  1. Special heat exchanger design, application quality material:
    a) durability;
    b) high efficiency;
    c) reliability.
  2. Stainless steel burner
  3. Optimum combustion chamber
  4. Temperature control
  5. Ease of installation and maintenance
  6. Polymer staining
  7. Reliability
  8. Maintainability
  1. Temperature controller to prevent overheating of the heat exchanger
  2. Shutting off the gas supply in the event of a blackout (flame control)
  3. Shutdown in the absence of traction
  4. Wind traction stabilizer
  5. Low boiler lining temperature

SPECIFICATIONS

Parameter or dimension name Value
AOGV 11.6-1 AOGV 17.4-1 AOGV 23.2-1
1. Fuel Natural gas
2. Nominal pressure of natural gas in front of the automation unit, Pa (mm water column) 1274 (130)
Natural gas pressure range, mm.water column 65…180* 1
3. Volume content of carbon monoxide in dry undiluted natural gas combustion products, %, not more than 0,05
4. Ratio useful action device, % not less than 89
5. Coolant water
6. Coolant parameters, no more than:
0,1
- absolute pressure, MPa;
- maximum temperature, ºС 95
- carbonate hardness, mg-eq/kg, no more 0,7
- content of suspended solids missing
7. Rated thermal power of the automatic burner, kW (kcal/h) 11,6 (10000) 17,4 (15000) 23,2 (20000)
8. Gas inlet size:
- nominal diameter Du, mm 15 20 20
G 1/2 -B G 3/4 -B G 3/4 -B
9. Safety automation parameters
- gas supply shutdown time for
pilot and main burners, sec
- when the gas supply is interrupted or there is no
flame on the pilot burner, no more
60
- in the absence of draft in the chimney, no more no less 10
10. Vacuum in the chimney behind the apparatus, Pa from 2.94 to 29.4
mm. water. Art. 0.3 to 3.0
11. Nominal passage of water connecting pipes Du, mm 40 50 50
- thread according to GOST 6357 - 81, inch G 1 1/2 -B G2-B G2-B
12. Mass of the device, kg, no more 45 50 55
13. Heated area, m 2, no more 90 140 190
14. Capacity of the heat exchanger tank, liter 39,7 37,7 35
15. The maximum temperature of the combustion products leaving the chimney, ° С (gas pressure 180 mm of water column) 130 160 210
*1 NOTE. The device is protected from emergency supply of inlet gas pressure up to 500 mm. water. Art. gas valve design.


DEVICE AND PRINCIPLE OF WORK.

The device consists of the following components and parts: a heat exchanger tank, a main burner, an ignition burner block with a thermocouple and an ignition electrode installed in it, a combined gas valve (multifunctional regulator), a draft stabilizer, lining parts.

In the upper part of the tank - heat exchanger, a temperature controller sensor is installed, connected by a capillary tube to the thermostatic valve actuator ("bellows - thermoballoon" system), and a thermometer sensor

The design feature of the 630 EUROSIT combined valve is the presence of a device for stabilizing the outlet gas pressure, as well as the combination of valve control in one handle with the designation of the positions by the corresponding symbols and numbers on its end face and the pointer on the valve cover. The dependence of the temperature of the heated water on the position of the control knob scale is shown below:

The principle of operation of the temperature controller is based on the expansion of the liquid when heated. Working fluid, heating up in the sensor (thermoballoon) from the water in the heat exchanger tank, heated by the combustion of natural gas, expands and flows through the capillary tube into a bellows, which converts the volumetric expansion into a linear movement of the mechanism that drives the system of two valves (instantaneous and metering). The design of the mechanism provides protection against thermal overload, which protects the "bellows - thermal bulb" system from damage and depressurization.

  1. When setting the desired water temperature in the apparatus with the control knob to increase, the instantaneous (click) valve first opens, then the dosing valve.
  2. When the water temperature in the device reaches the set value, the dosing valve is smoothly closed, switching the main burner to the "small gas" mode.
  3. When the temperature rises above the set value, an instantaneous (click) valve is activated, completely shutting off the gas to the main burner.
  4. In the absence of draft in the chimney, the exhaust gases from the furnace heat the draft sensor, the sensor is triggered by opening the normally closed contacts of the thermocouple circuit. The electromagnetic (inlet) valve closes and shuts off gas access to the main and pilot burners. The draft sensor is designed to operate during the absence of thrust for at least 10 seconds.
  5. When the gas supply from the network is interrupted, the pilot burner instantly goes out, the thermocouple cools down, the electromagnetic valve closes, blocking the gas access to the main and pilot burners. When the gas supply is resumed, the passage through the apparatus is completely blocked.
  6. When the gas pressure in the network drops below 0.65 kPa, the gas pressure on the pilot burner will also drop, the thermocouple EMF will drop to a value insufficient to hold the valve. The solenoid valve will close and cut off the gas supply to the burners.

POSITIONING AND INSTALLATION

Placement and installation of the apparatus, as well as gas supply to it, is carried out by a specialized construction and installation organization according to a project agreed with the operating enterprise (trust) of the gas facilities.

The room where the device is installed must have free access of air from the outside and a ventilation hood near the ceiling.

The temperature of the room where the device is installed must not be lower than +5 ºС.

The choice of a place for the installation of the device should be made in accordance with the instructions for the safety measures set out in section 7 of this passport.

The device is installed near fireproof walls at a distance of at least 10 cm from the wall.

  1. When installing the apparatus near a fire-resistant wall, its surface must be insulated with a steel sheet over an asbestos sheet with a thickness of at least 3 mm, protruding 10 cm beyond the dimensions of the housing. There must be a passage at least 1 meter wide in front of the apparatus.
  2. When installing the apparatus on a combustible floor, the floor must be insulated with a steel sheet over an asbestos sheet with a thickness of at least 3 mm. The insulation should protrude 10 cm beyond the enclosure dimensions.

Before starting the installation, it is necessary to depreserve the device, check the correctness of its assembly in accordance with Fig. 1 and fig. 8 of this passport, and make sure that all parts and assembly units are securely and completely fixed.

Connect the device to the chimney, gas pipeline and pipes of the heating system. The connecting pipes of the pipelines must be exactly fitted to the location of the inlet fittings of the apparatus. Connection should not be accompanied by mutual tension of pipes and units of the apparatus.

SAFETY INSTRUCTIONS

Persons who have studied this passport are allowed to service the device.

The installation and operation of the apparatus must comply with the requirements of the Rules for the Design and Safety of Operation of Hot Water Boilers, Water Heaters and Steam Boilers with Overpressure, as well as the requirements of the Safety Rules for Gas Distribution and Gas Consumption Systems. PB 12 - 529", approved by the Gosgortekhnadzor of Russia.

The operation of the devices must be carried out in accordance with the "Rules fire safety for residential buildings, hotels, hostels, buildings of administrative institutions and individual garages PPB - 01 - 03.

The operation of the device is allowed only with serviceable automatic safety and thermal control.

Gas safety automatics should provide:

  1. Reducing the gas supply when the water temperature in the heating system reaches the set value.
  2. Shutdown of gas supply to the main burner when the set heating temperature is exceeded.
  3. Turn off the gas supply to the device in the following cases:
    • when the gas supply to the apparatus is interrupted (for a time not exceeding 60 seconds);
    • in the absence of draft depression or in the boiler furnace (for a time not less than 10 seconds and not more than 60 seconds);
    • when the torch of the pilot burner goes out (for a time not exceeding 60 seconds).

During operation of the device, the temperature hot water must not exceed 95 °C.

It is forbidden:

  1. operate the device with the heating system partially filled with water;
  2. use other liquids as a heat carrier instead of water**;
  3. install shut-off and control valves on the supply line and the pipeline connecting the heating system with the expansion tank;
  4. operate the device in case of gas leakage through the gas pipeline connections;
  5. use an open flame to detect gas leaks;
  6. operate the device in case of a malfunction of the gas network, chimney or automation;
  7. independently troubleshoot the device;
  8. make any structural changes to the apparatus, gas pipeline and heating system.

When the machine is not in operation, all gas valves: in front of the burner and on the gas pipeline in front of the machine, must be in the closed position (the handle of the valve is perpendicular to the gas pipeline).

Any malfunctions during the operation of the apparatus on gas must be immediately reported to the emergency service of the operating enterprise of the gas economy.

If gas is found in a room, immediately stop its supply, ventilate all rooms and call an emergency or repair service. Until the malfunction is eliminated, it is forbidden to light matches in the room, smoke, use

** It is allowed to use household coolant "Olga" (manufacturer: CJSC "Plant of Organic Products") according to the instructions for use. After a period of operation, the coolant must be drained and disposed of.

Specifications

The floor gas non-volatile single-circuit boiler ZHMZ AOGV-17.4-3 Comfort N with an open combustion chamber is designed for heating residential, domestic, industrial and other premises up to 140 sq.m. On the front side of this model, a removable chute is installed that covers the automation unit and the gas burner. The advantage of the ZhMZ AOGV-17.4-3 Comfort N boiler, the most popular among consumers, is the ability to work in systems with natural and forced air circulation, the boiler is compatible with any material from which the heating system is made (steel, cast iron, polypropylene, metal-plastic), as well as its work does not depend on electricity and can be configured to work on natural or liquefied gas.

Peculiarities

  • Complete with imported automation unit
  • Provides convenience and comfort in use
  • Has a compact design
  • Allows you to select the temperature mode
  • Has the ability to adjust the height of the ignition flame
  • Allows you to adjust the gas pressure with a built-in regulator
  • The safety of the boiler is ensured by the additionally installed automatic overheating
  • Ignition lockout after flame out
  • The convenient location of the automation unit and the built-in piezo ignition provide easy start-up of the boiler
  • Classic cylindrical shape
  • Stable operation at low gas pressure
  • Equipped with Honeywell gas valve (USA)
  • Equipped with a pointer thermometer, which allows you to visually control the temperature of the coolant in the heating system
  • The heat exchanger is made of high-quality metal produced by NLMK
  • The thickness of the heat exchanger steel in the burner area is 2.5 mm
  • Screw turbulators are made of steel 2 mm thick and increase the efficiency of the boiler
  • Heating system coolant - softened water or household antifreeze
  • The service life of the boiler is at least 14 years

Specifications

Boiler type Gas

Mounting method Floor

Combustion chamber type open

Thermal power, kW 17.4

Natural gas Yes

LPG Yes

Chimney diameter, mm 135

Steel

non-volatile Yes

Manufacturer Russia

Boiler type Gas

Working principle Convection

Number of circuits Single circuit

Mounting method Floor

Combustion chamber type open

Thermal power, kW 17.4

Natural gas Yes

LPG Yes

Chimney diameter, mm 135

Primary heat exchanger material Steel

non-volatile Yes

Manufacturer Russia

Power consumption, kW 17,4

Burner type Injection

Tank capacity, l 64

Ignition time, no more, sec 60

Overall dimensions (HxWxD), mm 1045-1055x415-425x475-485

Water pressure in the heating system, no more than, kPa 100

Diameter of heating pipes, inch G2

Gas supply fitting diameter, inch G 3/4

Range of maintaining the temperature of the heat carrier in the heat exchanger, ° С 50-90

Leak allowed, no more than, cc/h 70

Carbon monoxide index, no more than, vol.% 0.05

Number of screw turbulators, pcs 8

Efficiency in heating mode, not less than, % 88

Boiler weight (without packaging), no more than, kg 49

Minimum / maximum pressure of natural gas, Pa (mm w.c.) 635 (65)/1764 (180)

Minimum / maximum pressure of liquefied gas, Pa (mm water column) 1960 (200)/3528 (360)

Minimum / maximum vacuum in the chimney, Pa (mm water column) 2,94 (0,3)/29,4 (3,0)

Outer diameter of the connecting branch pipe of the gas exhaust device, mm 133-137

Nominal pressure of natural gas, Pa (mm.water column) 1274 (130)

Nominal pressure of liquefied gas, Pa (mm water column) 2940 (300)

Heating of premises with heat loss no more than, kW 14.5

Heated room area H=2.7 m high, no more than, sq.m 100-140

Distance from the floor to the end of the outlet pipe of the heat exchanger, mm 1045-1055

Distance from the floor to the axis of the inlet pipe of the gas pipeline, mm 835-845

Distance from the floor to the axis of the inlet pipe of the heat exchanger, mm 287-297

Consumption of natural gas, no more than, m3/h 1.87

Consumption of liquefied gas, no more than, cubic m / h (kg / h) 0,65 (1,3)

Ignition type Piezo ignition

High reliability

The safety of the ZhMZ AOGV-17.4-3 Comfort N boiler operation is ensured by automatic equipment, which is triggered when the flame on the igniter goes out, there is no draft in the chimney, the gas supply is interrupted or the gas pressure drops below the permissible value, the temperature of the coolant in the boiler tank rises above 93 - 100 °C. The pressure in the closed heating system in which the boiler can be used must not exceed 2.0 kgf/cm2.

floor gas non-volatile single-circuit boiler with an open combustion chamber

About delivery

    • Delivery is carried out on working days from 12:00 to 18:00 Moscow time
    • Delivery outside the Moscow Ring Road is 50 rubles / km and is paid according to the actual distance traveled by the car. We recommend using the Yandex.Maps service to find out the exact distance.
    • Delivery at a distance of more than 130 km from Moscow is carried out through transport and logistics companies
    • Delivery on weekends, holidays, urgent delivery the same day, delivery of the order at exactly the specified time is carried out at increased rates and after agreement with the store
    • Upon delivery of the order by truck, the unloading of the goods is carried out by the Buyer
    • Approximately 1 hour before delivery, the forwarder contacts the Buyer. If it is impossible to confirm the acceptance and transfer of the order to the appointed address, the delivery is canceled
    • Pickup is carried out after the store confirms the movement of goods to the point of issue of the order
    • The forwarder does not consult on the technical parameters and functional features of the goods, their compatibility, cost, etc. This information can be obtained by calling our office at the contact numbers
    • Our trucks deliver orders along pre-planned routes on a schedule that provides for high accuracy. Therefore, we ask you to be understanding that unloading, checking and payment for goods must be made within 10-15 minutes.

About payment

    • We accept payment for the goods only in rubles for cash or bank transfer
    • The price of the goods includes the VAT rate of 20%
    • Sending an order to the regions of the Russian Federation through transport companies is made to the Buyer's address only after 100% prepayment
    • The exact cost of payment is calculated from the cost of goods and the cost of delivery (outside the Moscow Ring Road, for urgency, for the exact delivery time) of the order. Please take this into account

Installation

The specialists of our company carry out a paid visit to the site, while the cost of the visit is returned upon conclusion of the contract, on the spot they will agree with you on the terms, stages and scope of work, select equipment and components.

After the conclusion of the Contract and the prepayment, the delivery, installation and commissioning of the equipment is carried out at the appointed time. Upon completion of the work, Acts are drawn up and full payment is made.

The prices for the departure of a specialist and installation of equipment can be found at the link.

Service and repair

At your request, the company is ready to conclude an annual service agreement with you. The advantage is an extended warranty for the work performed and preferential maintenance of equipment.

If such an Agreement has not been concluded, then you can contact the specialized service centers at